akoizo

SCIENCE OLYMPIAD / DIVISION C / ENGINEERING

Boomilever Science Olympiad study guide (Division C)

Seven units take you from the scoring formula to a tested, efficient wooden cantilever. In C the base design touches the wall only above the 15 cm line, and the Load Scored Bonus (7,500 g) needs contact above the 10 cm line plus a full 15 kg hold. Each unit pairs the statics with the decisions you make at the bench.

Akoizo’s Boomilever resources are free for SciOly students and school teams. Sign in with your school to open the lessons and practice in the study dashboard.

Study Boomilever free
EVENT TYPE

Design & engineering

Boomilever is a build event. Prepare with design principles, build planning, testing, and engineering vocabulary.

LESSONS

7 lessons

7 units cover the Boomilever topic list, with key terms, worked examples, and practice questions in every lesson.

PRACTICE

5 practice tests

Past Boomilever tests from invitationals and tournaments, converted to submit online with answer feedback.

What the Boomilever lessons cover

Unit 1: Reading the event: score, tiers, and the bonus decision

Calculate a Boomilever score from load supported, bonus, and structure mass. Explain how Tier 1, Tier 2, and participation placement work. Decide when the Load Scored Bonus is worth the extra mass.

  • Reading the event: score, tiers, and the bonus decision

Unit 2: Statics of a cantilever: moments, tension, and compression

Find the moment the load creates about the Mounting Bolt. Identify which members carry tension and which carry compression. Use a force couple to estimate member forces.

  • Statics of a cantilever: moments, tension, and compression

Unit 3: Geometry: contact depth, strut angle, and the bonus line

Relate contact depth and reach to chord and strut forces. Explain why the bonus contact line makes the structure heavier. Choose a geometry that balances force, length, and mass.

  • Geometry: contact depth, strut angle, and the bonus line

Unit 4: Wood selection, density, and buckling

Compare balsa and basswood for tension and compression members. Sort wood by density to match strength to job. Use the Euler buckling idea to size and brace a strut.

  • Wood selection, density, and buckling

Unit 5: Joints, adhesives, and the bolt hook

Explain how glue joints carry shear and why area matters. Design a bolt hook that seats securely on the Mounting Bolt. Avoid adding mass with excess adhesive.

  • Joints, adhesives, and the bolt hook

Unit 6: The test apparatus, setup, and loading procedure

Describe the Testing Wall, contact lines, and Mounting Bolt Assembly. List what the Event Supervisor checks before sand is poured. Plan a six-minute setup and loading routine.

  • The test apparatus, setup, and loading procedure

Unit 7: Testing, failure analysis, and iteration

Run controlled tests that change one variable at a time. Read failure modes to decide what to change next. Keep a build log that predicts competition performance.

  • Testing, failure analysis, and iteration

Boomilever practice tests

Free Boomilever study tools

Read the official Boomilever Division C rules (PDF). Always confirm current rules with your tournament.

Recommended references

Bring Boomilever prep to your school team

Instructors can add their school for free, assign lessons and practice tests, and follow student progress.

Akoizo is independent and is not affiliated with Science Olympiad, Inc.

Add your school
Student sign in